1. Surveying and Leveling
- Built during the Fourth Dynasty
- Aligned closely to true north
- Bedrock leveled before construction
Constructed around 2550 BCE for Pharaoh Khufu, the Great Pyramid began with precise planning. Ancient surveyors leveled the limestone bedrock and aligned the base almost perfectly to true north, likely using stellar observations to guide their orientation.
2. Quarrying and Transport
- Core limestone quarried locally
- Fine casing brought across Nile
- Hauled on lubricated sledges
Builders quarried most core stone on the Giza plateau, while finer white limestone arrived by boat from Tura across the Nile. Organized work gangs hauled the multi-ton blocks across the ground on heavy wooden sledges, wetting the sand ahead of the runners to reduce friction.
3. Ramps and Layered Construction
- Raised using earthen ramps
- Casing laid course by course
- Granite used for inner chambers
Archaeologists deduce that builders used earthen and rubble ramps to haul materials upward tier by tier. Heavy white casing stones were not added later; they were integrated directly into each horizontal course alongside the rougher core blocks as the pyramid climbed.
4. Smoothing the Exterior
- Surfaces dressed from peak downward
- Ramps dismantled gradually
- Gleamed brightly in sunlight
After the pyramid reached its capstone, masons worked from the top down to chisel away the protective excess stone from the outer casing faces. As the construction ramps were dismantled tier by tier, workers polished the angled white limestone to create a seamless, gleaming monument.